Foreshore Forcemain Upgrade
FORESHORE SANITARY FORCEMAIN REPLACEMENT AND RELINING
This project started in January of 2016 and included two phases. The first was an open cut section of force-main replacement, the replacement was for approximately 850m of C900 PVC force-main including 3 tie-ins, air release and site restoration. The second phase was a relining component which included the relining of approximately 1,800m of existing sanitary main, along with access construction, rig mat placement and removal, manhole relining and replacements and a section of open cut replacement. The role Lawson played in these projects was for the construction inspection and site administration services required by the City of Salmon Arm. Lawson worked alongside the design engineer to provide on-site inspection services and assistance in the contract administration requirements.