HILLER ROAD TO SILVERSANDS WATERMAIN EXTENSIONS
Lawson completed a watermain extension project for the District of Sicamous in 2017 through to 2020, this extension included the survey, design, tendering, contract administration and record documentation for approximately 420m of 200mm watermain and another 550m of 250mm watermain extension which includes two CP Rail crossings and a river crossing and utilized C900 DR18 PVC Fusible Pipe and included Horizontal Drilling and Jack and Bore construction. The project included many reporting procedures, and permitting requirements, as well as a significant implementation and coordination plan throughout.